An installation crew fits a punched steel deck between two evergreen posts of a half-built commercial play structure, with the assembly drawing on a sawhorse and a tablet in the crew lead's hand
S1 · Step 06Drawing step = video segment = part numbers

Playground Equipment Installation Drawings, Video Guides, Supervisors and Spare-Parts Kits

Playground installation files and support for installers building commercial playgrounds, indoor soft play and trampoline courts from our equipment.

  • Every outdoor structure pre-assembled before packing
  • Video filmed on your own structure, by drawing step
  • Questions answered by the yard lead who pre-assembled it
  • Labor hours per structure in the quotation
  • Spare kit with security bits

02/ 14Three rounds · 14 items · steps 01–10

Installation Package Files Your Installer Receives, and When

Your installer receives the installation files in three rounds, so the job can be planned and excavated before the container arrives. The table shows every file, video and bag of hardware against the step of the on-site sequence it is used in.

  • All installation documents in English
  • The same package stays on file for every project
  • Dealer brand on the manual and carton labels → wholesale
A freshly opened carton on site holding a printed assembly drawing set, a tablet, bags of labeled hardware and a spare kit boxInstallation package · S1
Opened on site: drawing set, videos, hardware by part number
Installation package items, the round they arrive in and the installation steps they are used in
ItemRound01020304050607080910
Round 1 · Drawing approval day→ Excavation can start
Footing detail drawingsConcrete footing size for every post, shade posts and freestanding piecesR1Step 01Step 05
Approved layout + footing points layerIn ft-in for US projects, mm for EN markets, or bothR1Step 01Step 03
Indoor frame anchor pointsMarked on the drawing for your structural engineer to confirmR1Indoor projects · before the frame goes up
Round 2 · During production
First cut of your installation videoReviewed with the pre-assembly photos and videoR2Your review point · before packing
Tool listIssued with the drawings, so the crew arrives with the right toolsR2Step 01
Round 3 · With the shipping documents→ Before the container is opened
Assembly drawing set per structureExploded views, step numbers, part numbers, bolt sizesR3Step 03Step 04Step 06Step 07Step 08Step 09
Final installation videoOne per structure, segmented by drawing stepR3Step 04Step 06Step 07Step 08
General category guidesFootings, base plates, padding, beds, surfacingR3Step 01Step 05Step 10
Part list + packing listKeyed to part numbersR3Step 02Step 03
Surfacing zone plan, area table, laying instructionsFor the surfacing materials in the shipmentR3Step 10
Inspection and maintenance guideIncludes the installer's completion checklistR3Step 10
In the container
Equipment, numbered to the drawingPacked in installation sequence, by structureBoxStep 02Step 03Step 07
Anchoring hardware for every postBoxStep 05
Spare kit with security bitsFasteners, caps, plugs, touch-up paintBoxStep 09
An installer stands beside a freshly dug footing hole, with stakes and string setting out the footing points and a footing drawing clipped to a boardFooting detail drawing · on site
Footing points set out from the layout, holes dug to the drawing

03/ 14Scope · six rows · one drawing

Supply and Site Work What We Ship and What Your Crew Builds

Both sides work from the same drawing. Each row below names the drawing that governs it, so the equipment in the container and the work on the ground meet in the same place.

What is supplied, what the installer or contractor carries out, and the drawing each row works from
We supplyThe same drawingYour installer or contractor carries out
Layout and footing detail drawingsFooting detailSite excavation and footing holes
Equipment, numbered to the installation drawingFooting detailConcrete footings, poured to the footing detail drawing
Anchoring hardware for every postLayoutLocal permits and inspections
Assembly drawing set and videos per structureAssembly setInstallation labor
Surfacing materials with laying instructionsZone planLaying the surfacing
Live video support and an optional supervisorChecklistPost-installation inspection with your playground inspector

04/ 14Sheet · S1 · step 06

Assembly Drawing Sets Exploded Views, Step Numbers and Bolt Sizes per Structure

Each structure on your layout gets its own assembly drawing set: the playground assembly drawings your crew builds from. Structure S1 has one set, S2 has another, and a swing bay or fitness station has its own sheet.

The number in the exploded view is the number printed on the label of the part, on the packing list and on the box. A crew member reading step 6 finds S1-014 in the view, finds the same label on the post and fits it where the drawing shows.

Sheet S1 · step 06Example sheet
Exploded view of assembly step 6 for structure S1: two posts, a punched deck lifted above them along dashed axes, and a barrier panel pulled out to the side BOLT SIZE · TORQUE — MARKED ON THIS SHEET DECK HEIGHT AND USE ZONE FROM THE SINGLE-ITEM PLAN
Structure S1Drawn from the model of your approved layoutChecked by a second designer

On the part

Macro of a blank white part label on an evergreen post, where the part number S1-014 is printedS1-014

On the box

Macro of a blank shipping label on the side of a carton, where the same part number appearsS1 · S1-014

On the packing list

  • S1-014 · postStep 06
  • S1 · deckStep 06
  • S1 · barrier panelStep 06

On site

An installer holds a punched deck and checks it against the drawing on the sawhorse
Pick a number on the sheet: the same number lights up on the part, the box and the packing list
  • Overview sheet

    The finished structure and its footing positions.

  • Numbered steps

    Assembly steps in the order the structure goes up.

  • Exploded view per step

    The parts that join at that step, pulled apart.

  • Part numbers

    Every part in the view, in the {structure}-{part} format, for example S1-014.

  • Bolts and torque

    Bolt sizes at each connection and the torque values, marked on the drawing.

  • Deck heights and use zones

    Taken from the single-item plan and elevation.

Who draws it

The design office draws the set from the same model as your approved layout, so footing points, deck heights and use zones match it. A second designer checks the set against the standards checklist before it is sent, as described on playground layout design.

Trampoline beds

Trampoline beds carry cell numbers in the same way, for example T1-014, so the crew hangs each bed in the cell the drawing shows.

Send your site plan and ask for the installation package with your quotation. The layout and itemized quotation come back within 3 working days.

05/ 14Ten steps · outdoor structure

On-Site Installation Sequence Ten Steps From Unpacking to the Completion Checklist

This is the order an outdoor play structure goes up in on your site, the playground installation sequence your crew follows from the first footing to the checklist.

Each step lists the drawing, the video segment and the numbers your crew works from, so commercial playground installation runs the same way on every structure.

  1. 01Set out
  2. 02Unpack
  3. 03Lay out
  4. 04Stand posts
  5. 05Set posts
  6. 06Decks, panels
  7. 07Roofs, slides
  8. 08Rope, nets
  9. 09Tighten, cap
  10. 10Surface, check
The crew sets out the footing points with string lines and digs the footing holes before the container arrives
Before the containerFooting detail drawing · footing points layer

Phase 1 · Before the container arrives

  1. 01

    Excavate and set out before the container arrives

    Your crew sets out the footing points from the layout and digs footing holes to the sizes on the footing detail drawing.

    For anchor-bolt base plates, the footings and anchor bolts can be poured in advance to the same drawing. On a school site, removing old equipment and old footings is covered on school playground equipment.

    Uses · footing detail drawing · footing points layer
Cartons for one structure opened in a row, parts laid out in groups beside the footing points
Unpack and lay outPacking list · part labels · steps on the drawing

Phase 2 · Unpack and lay out

  1. 02

    Unpack by structure number and check against the packing list

    Parts are packed in installation sequence, so the boxes for S1 come out together, in the order S1 is built. Your crew checks each box against the packing list by part number. Anything missing or damaged is reported now, at unpacking, with photos and part numbers.

    Uses · packing list · part labels
  2. 03

    Lay the parts out beside their footings

    Each structure's parts are laid out next to its own footing points, grouped by the step they belong to on the assembly drawing.

    Uses · assembly drawing steps · footing points
Two installers hold an evergreen post plumb while a third checks it with a level, the first deck already bolted
FrameOverview sheet · footing detail drawing · anchoring hardware

Phase 3 · Frame

  1. 04

    Stand the posts and fit the first decks

    Posts go into the footing holes in the positions on the overview sheet, and the first deck connections are bolted in to hold them in position. The frame is set plumb and level to the deck heights on the drawing.

    Uses · drawing steps for posts and decks · video segments with the same step numbers
  2. 05

    Set the posts

    For in-ground posts, the default, your crew pours concrete around the posts to the footing detail drawing once the frame stands plumb.

    For anchor-bolt base plates, the base plates are bolted to the anchors. The concrete mix and curing follow your installer's concrete specification.

    Uses · footing detail drawing · anchoring hardware
One installer lines up a yellow slide section with the deck while another fits a grey barrier panel above
Fit-outExploded views · video segments · part numbers

Phase 4 · Fit-out

  1. 06

    Fit decks, steps, barriers and panels

    Punched steel decks with plastisol coating, steps, and the 19 mm HDPE barriers and play panels go on in the step order of the drawing. The holes in posts and decks were matched at pre-assembly in our yard, so parts go together as they did there.

    Uses · assembly drawing steps · video segments
  2. 07

    Fit roofs, slides and tunnels

    Rotomolded roofs, slides and tunnels are fitted to their deck and post connections by part number.

    Uses · exploded view of each connection · video close views of the fixings
  3. 08

    Fit rope and nets

    Rope sections and climbing nets are fixed to their frames at the connectors shown on the drawing.

    Uses · assembly drawing · video segment for the net
An installer tightens a connection with a torque wrench while a colleague caps the fastener heads, surfacing already laid below
Close and checkTorque values on the drawing · spare kit · zone plan · checklist

Phase 5 · Close and check

  1. 09

    Tighten, cap and close

    Every connection is tightened to the torque value on the drawing. The 304 stainless steel tamper-resistant fasteners are driven with the security bits from the spare kit, and every fastener head is capped.

    Rotomolded post caps close every open post end, and plastic plugs close any exposed vent holes. Handling marks and any holes drilled on site are covered with touch-up paint in the structure's color.

    Uses · torque values on the drawing · spare kit
  2. 10

    Lay the surfacing and complete the checklist

    Surfacing is laid by your side to the thickness zone plan, then your installer works through the installer's completion checklist before your playground inspector visits.

    Uses · surfacing zone plan and area table · inspection and maintenance guide
A two-bay swing frame just stood up on its footings

Freestanding pieces

Swings, spinners, spring riders and fitness stations each have their own sheet and follow the same pattern: footing, frame or base plate, moving parts, tightening and caps. Their use zones on the layout show where each piece stands clear of the structures.

At every stage the drawing step, the video segment and the part numbers match each other.

06/ 14Video · cut from S1's pre-assembly

Installation Videos Filmed on Your Own Structure Segmented by Drawing Step

The installation video for each outdoor structure is cut from the pre-assembly and disassembly of that same structure in our pre-assembly yard.

What is filmed

When your structure stands in our yard, it is filmed going together in installation order, from posts to caps, so the video follows the order your crew builds in.

Close views show each connection, the bolt at each joint and the part number labels in frame, so your crew can read S1-014 on the screen and on the part in their hands.

Segments by drawing step

The video is segmented by the step numbers of the assembly drawing. Step 6 on the drawing is segment 6 of the video. When your crew is on step 6, they open segment 6 and watch only the connections for that step.

Example · structure S1 · steps 4 to 8 shown

Assembly drawing · S1

Video · same structure

Segment 4
Segment 5
Segment 6
Segment 7
Segment 8

Part labels in frame

In your project files, assembly drawing step 6, video segment 6 and the part labels seen in that segment, such as S1-014, all refer to the same connections.

When you receive it

  • First cutComes to you with the pre-assembly photos and video before packing. That is your review point: your installer can watch it, and any comment on the structure is raised before the parts are packed.
  • FinalComes in the electronic project package with the shipping documents, so your crew has it before the container is opened.

Indoor frames

Soft play, trampoline court and ninja course frames are trial-assembled in the same yard to check hole positions and connections, and that trial assembly is the footage for your frames. Padding follows the general guides.

What the general category guides cover

Work that depends on your site, or that happens after the structure stands, is covered by general category guides that come with the project videos.

  • General guide: concrete poured around a post in its footingGuideFooting excavation and setting posts in concrete
  • General guide: a base plate bolted onto anchor boltsGuideAnchor-bolt base plates
  • General guide: soft play padding fitted onto the frameGuideSoft play padding fitted by part number
  • General guide: a trampoline bed hung on its springsGuideHanging trampoline beds by cell number
  • General guide: poured rubber surfacing troweled levelGuideSurfacing laid to the zone plan
On site, the crew lead holds a phone on a video call toward a deck connection while another installer steadies the partWhatsApp video · from the structure
The crew calls from the step they are on

07/ 14WhatsApp video · booked to your hours

Live Video Support WhatsApp Calls Booked to Your Installation Hours

When a step is unclear on site, your installer books a WhatsApp video call. Calls are booked to your installation hours, so your crew can call from the structure. This is playground installation support from the people who know that structure.

  • A project manager at a desk with the printed assembly drawing of the order

    Project manager

    Takes the call and knows your order, drawings and packing list.

  • A yard lead in the pre-assembly yard with a hand on a post of a pre-assembled structure

    Yard lead

    Joins for questions about the structure itself: the person who stood your posts and fitted your decks in our yard.

What to send before the call

A phone snapshot of the deck-to-post connection the crew is working on

Step 06 · S1 · part S1-014 · photo attached

A photo of the step · the drawing step number · the part numbers from the labels

With the step number and part numbers, the yard lead can open the same step on your drawing and the same segment of your video before the call starts.

What happens on the call

The yard lead talks your crew through the connection with your drawing and the part in view on the camera. If the question is a part that is missing, damaged or incorrect, the project manager takes the photo and part number and starts the replacement on the same call.

Messages and photos any time · reply within 24 hours on business daysBook a Video Call on WhatsApp

Your crew builds each structure from a video of that same structure going together.

08/ 14Supervisor · first structure

On-Site Supervisor Four Tasks From Our Pre-Assembly Yard Team

For a first project, a large site or a new crew, you can add an on-site supervisor. The supervisor comes from our pre-assembly yard team, the team that assembles every outdoor structure before it is packed.

S1 · supervisor + your crew
S2S3S4… · your crew + video support
  1. The supervisor measures a footing position against the drawing
    1

    Checks footing positions

    Before the posts go in, the supervisor checks the footing holes or anchor positions on site against the footing detail drawing and the layout.

  2. The supervisor points at the drawing while two installers fit the first structure
    2

    Leads the first structure with your crew

    The supervisor builds the first structure together with your installers, step by step on the assembly drawing, with your crew doing the work.

  3. The supervisor shows a video segment on a tablet to two installers holding the matching part
    3

    Trains your crew

    While building the first structure, the supervisor shows your crew how the drawings, part numbers and videos are used, so the following structures go up to the same method.

  4. The supervisor signs the installation checklist on a clipboard
    4

    Signs off the installation checklist

    At the end, the supervisor signs off the installation checklist for the structures built.

How it is arranged

The supervisor's on-site time is confirmed in the quotation for your project. Visa invitation, accommodation and local transport are arranged as listed in the same quotation.

When it fits

  • Local contractorNew to commercial playgrounds and building a first project.
  • DealerStarting in a new region with a new crew.
  • FEC ownerOpening an indoor venue with soft play or a trampoline court.

The supervisor leads the first structure, and your crew finishes the rest with video support.

A supervisor from the pre-assembly yard team with a drawing in front of a pre-assembled structure
From the pre-assembly yard team · quoted separately

09/ 14Footing detail drawing · 3 methods

Posts and Footings In-Ground Posts in Concrete, or Anchor-Bolt Base Plates

The footing detail drawing sets out how each post meets the ground, and your installer builds the footings to it. The method is chosen per project before production.

In-ground posts set in concrete · default

Ø114 mm galvanized and powder-coated steel posts are set into concrete footings. The footing detail drawing gives the size of each footing, and the footing points layer gives its position.

Anchor-bolt base plates · option

Posts can be ordered with base plates bolted to anchor bolts in the footing. The anchoring hardware ships with the equipment, and the drawing shows the footing and bolt positions. Base-plate footings can be poured and cured before the container arrives, and the structure bolts down on arrival.

Slabs and rooftops

Small freestanding pieces and low structures can take a surface-mount base plate, with the fixing confirmed by your structural engineer, as on preschool and daycare playground equipment.

Section through one post: set in a concrete footing, bolted to a base plate on anchor bolts, or surface-mounted on a slab GROUND Ø114 mm FOOTING SIZE · ON THE DRAWING ANCHOR BOLTS · POSITIONS ON THE DRAWING SLAB OR ROOF DECK FIXING CONFIRMED BY YOUR ENGINEER
One post, three ways to meet the ground
An evergreen post set in freshly poured concrete, footing top troweled smoothA post base plate bolted to anchor bolts on a cured footingA small freestanding play piece fixed with a surface-mount base plate on a roof deck In-ground · concreteBase plate · anchor boltsSurface-mount

Shade posts, swings and fitness stations have their own footing sizes on the same drawing, so every hole on site is dug to a size your crew can read.

10/ 14Spare kit · in every shipment

Tools, Spare Kit and Replacement Parts Sent by Air Courier

A tool list comes with the drawings, so your crew arrives with the right tools on the first day. Every shipment includes a spare kit, packed with the equipment.

An opened spare kit on site: capped stainless fasteners, post caps, plastic plugs, a can of touch-up paint, security bits and spare springs
  1. 01Spare fasteners
  2. 02Post caps
  3. 03Plastic plugs for vent holes
  4. 04Touch-up paint in the structure's color
  5. 05Security bits for the tamper-resistant fasteners
  6. 06Spare springs on trampoline orders

Tool list

Issued with the drawings in production, before the container ships, so the right tools are on site the day the boxes open.

Missing or damaged parts

  1. At unpackingYour crew checks boxes against the packing list and reports a missing, damaged or incorrect part with photos and the part number.
  2. QC confirms the partOur QC team checks it against your project part list.
  3. Made to the same part numberThe replacement is made to S1-014 if S1-014 is the part reported.
  4. Small parts by air courierReplies come within 24 hours on business days.
A small courier box with a blank part label on a site palletS1-014

The part list is kept on file for your project, so a replacement for S1-014 is made to the same number at unpacking or years later.

The same soft play structure from the same camera position with all padding fittedA two-level soft play structure in an empty indoor venue with only its galvanized frame installed
Tap a strip: the bare frame becomes the padded structure

11/ 14Indoor · frame first · padding by number

Indoor Installation Frame Anchor Points First, Padding by Part Number

Soft play structures, trampoline courts and ninja courses go up in two stages: the steel frame, then the padding.

Steel frame

The Ø48 mm galvanized soft play frame, and the trampoline and ninja frames, are built from the assembly drawing set. Their hole positions and connections were checked at trial assembly in our yard, and the trial-assembly photos show part numbers.

Padding by part number

Once the frame is complete, padding is fitted by part number. Every padding piece, net and mat is labeled with a number keyed to its structure, for example S2-021, and listed on the packing list, so the crew matches each pad to its position on the drawing.

Venue plan with building columns, two entrances and a fire exit; the frame outline is dashed and its anchor points sit clear of the columns and doors ENTRANCEFIRE EXIT FRAME · Ø48 mm
Anchor points marked on the drawing · confirmed by your structural engineer

Frame anchor points

The anchor points for each indoor frame are marked on the drawing, placed around your columns and entrances. Your structural engineer confirms the fixing to the floor or building structure before installation.

A raised trampoline court frame anchored to the floor slab, beds half hung

Trampoline courts

Raised courts are anchored to the floor slab, and in-ground courts are set into a pit built by your contractor to our drawing. Beds are hung by cell number, with spare springs in the kit, as covered on trampoline park equipment. Floor plans for whole venues are on indoor playground equipment.

The crew lays poured rubber surfacing under a finished structure: one trowels, one pours
Rubber tiles being laid on another part of the site

Poured-in-place EPDM or rubber tiles: the surfacing materials in your shipment are partner-supplied, with laying instructions for each.

Thickness by critical fall height

Thickness is chosen by the critical fall height of the equipment it sits under. The zone plan is drawn from the use zones on your layout. Accessible surfacing on the accessible route is drawn to ASTM F1951.

After laying

The on-site surfacing thickness check is part of the post-installation inspection by your installer or playground inspector.

12/ 14Surfacing · laid by your side

Surfacing Installation Files Thickness Zone Plan, Area Table and Laying Instructions

Surfacing is laid by your side, from files and materials that come with the equipment.

Thickness zone plan

Which thickness goes under and around each piece of equipment.

Area table by surfacing type

TypeZoneArea
Rubber tilesPer planOn your plan
Poured EPDMPer planOn your plan

For ordering and laying.

Laying instructions

For the partner-supplied rubber tiles or poured-in-place EPDM, with critical-fall-height data from the surfacing partner.

13/ 14Installer's completion checklist · 6 checks

Completion Checklist and Handover Before Your Playground Inspector Visits

The inspection and maintenance guide in your project package includes an installer's completion checklist, for your installer to work through before your playground inspector visits.

What the installer checksTick as you go

/ 6

Checks doneReady for your playground inspector

Handover to the owner

The owner receives the inspection and maintenance guide for ongoing checks, and the installation drawing, part list and packing list for the site file. The post-installation inspection is done by the owner's installer or playground inspector against the use zones and deck heights on the drawing.

  • Inspection and maintenance guide
  • Installation drawing
  • Part list
  • Packing list

→ The site file

The crew lead hands a document folder to the facility manager beside the finished structure

14/ 14One file · two readers

Owners and Installers Quoting, Briefing and Building From One File

Built for playground installers and contractors, dealers who install their own jobs, and the parks departments, schools, childcare centers and FEC owners who hire an installer for their site.

A facility manager and the crew lead look over the printed drawing at the site fence

Owners hiring an installer

Parks departments, schools, childcare centers and FEC owners order directly and hand the installation package to their local installer.

The estimated installation labor hours per structure in the quotation, with the footing detail drawings, let installers quote the job and let you compare bids from playground installation companies against one figure.

An installation crew unloads labeled cartons from a flatbed truck

Installers buying equipment

Installers send the site plan, receive the layout and quotation, and build from numbered parts with video support. Dealer and installer terms are on wholesale playground equipment; outdoor ranges are on commercial playground equipment.

  • Projects registered under your name
  • Files unbranded or under your brand
  • End-client details kept confidential
Phase 1S1S2S3
Phase 2S4 …

Phase 2 jobs are ordered to the same project file, so drawings and part numbers continue from phase 1.

Upload your drawing and say who is installing. The installation package, labor hours and supervisor option come back with the quotation.

Who is installing
On-site supervisor
Site

File attached? Anna will ask you to send it by email or WhatsApp after the form arrives.

Form not going through? Message Anna on WhatsApp +86 177 0272 7677

Send Site Plan WhatsApp