A community park in morning light where a two-person parks maintenance crew replaces a grey HDPE panel on a play structure, with a toddler structure, swings, shade and fitness stations behind

Park PlaygroundEquipmentMunicipal Playgrounds Planned Around Your Site and Budget

Play, shade and fitness on one plan for each park, every park on the same component system, and the files for public meetings and open bids at each step.
  • 0112+ years in commercial play equipment
  • 02Designed to ASTM F1487 / EN 1176
  • 03One department parts list across every park
  • 04Every outdoor structure pre-assembled before packing
  • 052D/3D layout in 3 working days
02/ 14 · Ten items park projects draw from most

Park Playground Equipment RangeStructures, Swings, Fitness, Shade, Splash Pads and Entry Signs

Park playground equipment for pocket, neighborhood, community and destination parks, drawn on one layout for each park. The range below is what park projects draw from most.

It is commercial-grade and built for public sites that stay open every day of the year: Ø114 mm galvanized and powder-coated steel, 19 mm HDPE, rotomolded LLDPE and 304 stainless tamper-resistant fasteners.

  • Low 2–5 play structure with short slides, a crawl tunnel and ground-level play panels in a parkRP-01.1 · Ages 2–5

    2–5 play structures

    Low decks, short slides, crawl tunnels and ground-level play panels.

    In-houseStructures
  • 5–12 play structure with a steel-core rope net, climbers and a taller slide in a parkRP-01.5 · Ages 5–12

    5–12 play structures

    Climbers, 16 mm steel-core rope nets, taller slides and overhead pieces.

    In-houseRope nets
  • Two-bay park swing frame with belt seats, a toddler bucket seat and a nest swingRP-01.3

    Swings

    Belt seats, toddler bucket seats, inclusive high-back seats and nest swings on sealed-bearing hangers.

    In-houseSwing sets
  • Sealed-bearing spinner and a rotomolded spring rider on park surfacingRP-01.4 · RP-01.6

    Spinners, spring riders and seesaws

    Sealed-bearing spinners and rotomolded rider bodies.

  • Ramp and transfer platform leading to an upper deck, with ground-level play panelsRP-01.8

    Inclusive pieces

    Ramps, transfer platforms and ground-level panels on the accessible route.

  • Outdoor fitness stations beside a park path in use by adultsRP-10 · Ages 13+

    Outdoor fitness stations and trails

    For ages 13 and over, as a zone beside the play area or along paths.

    In-houseFitness
  • Shade sail on its own posts over a play structure in a parkRP-09 · On its own posts

    Shade

    Sails, canopies and cantilevers on their own posts and footings.

    Frames in-houseShade
  • Splash pad spray features in a park on a sunny morningRP-05

    Splash pads

    Spray features and ground jets on the same drawing and container plan.

    Partner-builtSplash pads
  • Poured-in-place rubber surfacing and rubber tiles under a play structureRP-08 · By fall height

    Surfacing

    Rubber tiles and poured-in-place EPDM, chosen by the fall height of each piece.

    Partner-builtSurfacing
  • Playground entry sign in HDPE at the entrance to a park play areaCNC · 19 mm HDPE

    Playground entry signs

    Age range and playground rules, CNC-engraved in 19 mm HDPE.

    In-houseEntry signs
03/ 14 · Four kinds of park

Park Layouts by Park TypePocket, Neighborhood, Community and Destination Parks

The zones on a park layout follow the kind of park it is. A small city park playground on a corner lot carries one structure; a community park playground carries every age group, a fitness zone and shade across the play area.

Your park types:
Pocket park on a corner lot with a compact play structure, freestanding swings and spring ridersPocket

Pocket parks

One compact 2–5 or combined structure with freestanding swings and spring riders, on a small corner or infill lot.

  • 2–5 or combined
  • Swings
  • Spring riders
Neighborhood park with a 2–5 zone and a 5–12 zone side by side, a swing bay and shadeNeighborhood

Neighborhood parks

A 2–5 zone and a 5–12 zone side by side, a swing bay, and shade over the caregiver edge.

  • + 2–5 zone
  • + 5–12 zone
  • + Swing bay
  • + Shade
Community park with separate structures, spinners and rope nets between zones and a fitness area beyondCommunity

Community parks

Separate 2–5 and 5–12 structures, spinners and rope nets between zones, an outdoor fitness zone for teens and adults, inclusive pieces on the accessible route, and shade across the play area.

  • 2–5
  • 5–12
  • Swings
  • Shade
  • + Spinners
  • + Rope nets
  • + 13+ fitness
  • + Inclusive
Destination park with a large themed structure, fitness trail, splash pad and inclusive play areaDestination

Destination parks

Every zone of a community park, plus larger themed structures, fitness trails along paths, splash pads and a full inclusive play area.

  • Every community zone
  • + Themed structures
  • + Fitness trails
  • + Splash pad
  • + Full inclusive area

A department can send several parks at once. Each park gets its own layout and project file, on the same component system.

Send the plans for these parks
04/ 14 · Three generations on one drawing

All-Ages Park Plans2–5, 5–12 and 13+ Zones, Shade and the Accessible Route on One Drawing

A park is used by whole families at the same time, so our design office draws every age group onto one plan: toddlers, older children, teenagers and the adults who bring them.

Drawn on your DWG base
A parent crouching beside a toddler at the edge of the 2–5 zone2–5 · caregivers
Teenagers using outdoor fitness stations with an instruction sign beside themF1 · 13+
A shade sail shadow falling over a play structure and the caregiver edgeH1 · own posts

Zones by age

The 2–5 zone and the 5–12 zone are drawn as separate blocks, with and fall zones checked so they do not overlap. A 6–23 month zone to can be added. Each structure carries a manufacturer label and an age-range label.

Teen and adult fitness

Fitness stations are drawn as a separate teen and adult zone beside the play area, with a zone sign at its entry. Every station carries an HDPE instruction sign with the 13+ marking and the words “unsupervised equipment”, to .

Shade

Shade stands on its own posts and footings, placed outside every equipment use zone, over structures, sand areas and caregiver edges. Shade posts and frames come from our steel workshop with footing drawings.

Accessible route

The is drawn from the park path to every inclusive piece, with accessible surfacing to ASTM F1951 along it and a color change at the route edge.

Existing park features

Mark trees, paths, parking, lighting and drains on your plan. When you send a DWG, we draw on your base and coordinates, and your engineer or landscape architect reviews and stamps the site design. Drawing steps are on playground layout design.

Use zone: the ground around a piece of equipment that must stay clear of other equipment and obstacles, set by the standard for that piece.
ASTM F2373: the US standard for public play equipment for children 6 to 23 months.
ASTM F3101: the US standard for unsupervised public outdoor fitness equipment for users 13 and over; EN markets use EN 16630.
Accessible route: a firm, continuous path from the park path to the play pieces that a wheelchair user can travel, with accessible surfacing along it.
05/ 14 · Seven options for sites with no staff

Vandal-Resistant Park SpecificationStainless Slides, Tamper-Resistant Fasteners and Bolt-On Replaceable Parts

A public park playground is open day and night with no staff on site. These are the vandal-resistant options we draw onto park orders, each listed on the quotation.

Brushed stainless steel wave slide on a park play structure304 brushed stainless
01

Stainless steel slides

304 brushed stainless in straight and wave forms, in place of rotomolded slides, partner-built and inspected by our QC before loading.

On siteA plastic slide gets scratched or marked.
Your crewNothing to replace: the slide is 304 stainless.
Listed on the quotation
Capped stainless tamper-resistant fastener and the security bit that opens it304 · security bit
02

Tamper-resistant fasteners

304 stainless, capped, standard on every structure, opened only with the in your spare kit.

On siteSomeone tries to back a bolt out with ordinary tools.
Your crewOpens it only with the security bits from the spare kit.
Standard on every structure
A crew member unbolting a damaged HDPE panel while the posts stay in place19 mm HDPE · bolt-on
03

Bolt-on HDPE panels

19 mm panels bolted to the frame, so a damaged panel is unbolted and replaced by its part number while the posts stay in place.

On siteA panel is kicked through or cracked.
Your crewUnbolts it and fits the new one by part number; the posts stay in place.
Listed on the quotation
A scratch on a rotomolded slide showing the same color through the wallRotomolded LLDPE
04

Colored-through rotomolded parts

Slide, tunnel and roof resin is , so a scratch shows the same color.

On siteA slide or roof is scratched.
Your crewLeaves it: the scratch shows the same color.
Listed on the quotation
A rope net section being changed at its connectors16 mm steel core
05

Replaceable rope sections

Nets and climbers change one section at the connectors.

On siteOne rope in a net is cut.
Your crewChanges that one section at its connectors; the rest of the net stays up.
Listed on the quotation
Rotomolded post cap on a steel post and a plastic plug in a vent holeØ114 mm post cap
06

Post caps and plugs

Every open post end has a rotomolded post cap, and exposed vent holes are closed with plastic plugs.

On siteA cap is pried off or a vent hole is stuffed with litter.
Your crewFits a new cap or plug from the shared stock.
Listed on the quotation
Touch-up paint in the structure's color applied to a mark on a postRAL · spare kit
07

Touch-up paint

In the structure’s RAL color, shipped in the spare kit for site marks.

On siteMarks and scuffs on a powder-coated post.
Your crewTouches it up in the recorded RAL color.
In the spare kit

These options sit on the same component system as every other park in your department, which is what the parts list below is built on.

See the department parts list
Security bit: the driver bit that fits the tamper-resistant fastener heads. It ships in every spare kit, and the same bit fits every park built on the component system.
Colored through: the color is in the resin itself, not a surface coat, so the wall is the same color all the way through.

Every park in your department on one component system, one parts list and one spares stock.

06/ 14 · One parts list for the whole department

Department Parts List and Shared SparesOne Spares Stock for Every Park

A parks department looks after many playgrounds with one maintenance crew and one parts budget. Parks and recreation playground equipment from us is set up so every park’s parts come from the same stock.

One component system across parks. Every park is built from the same Ø114 mm posts with 3.0 mm walls, the same 304 tamper-resistant capped fasteners, the same security bits, the same post caps and plugs, and 19 mm HDPE panels. The RAL code of every part is recorded. A fastener, cap or security bit bought for the first park fits the fifth park.

Part numbers from the drawing. Structure numbers are assigned on the layout, and every part number takes the structure number as its prefix, such as S1-014. Fitness stations carry F numbers and shade carries H numbers. Parts are numbered to the installation drawing, and the numbers stay on the parts.

Department parts list: which parts are shared across pocket, neighborhood, community and destination parks, and which belong to one structure
PartNumbered as PocketNeighbor­hoodCommunityDestination On your shelf
Shared across every park
Ø114 mm post, 3.0 mm wallStructure prefixIn every parkIn every parkIn every parkIn every parkOne shelf · every park
304 tamper-resistant capped fastenerSame on every structureIn every parkIn every parkIn every parkIn every parkOne shelf · every park
Security bitSame bitIn every parkIn every parkIn every parkIn every parkOne shelf · every park
Post capSame capIn every parkIn every parkIn every parkIn every parkOne shelf · every park
Plastic plugSame plugIn every parkIn every parkIn every parkIn every parkOne shelf · every park
Touch-up paintBy RAL codeIn every parkIn every parkIn every parkIn every parkOne shelf · every park
One structure
19 mm HDPE panelStructure prefixS1-014S2-011S2-014S3-008Order by part number
Custom panelCNC file———S3-022Cut again from its file
Rotomolded slideSteel moldS1-005S2-005S1-007S2-005Order by part number
Fitness station bearingF number——F1-006F2-006Order by part number
Rubber bumperF number——F1-011F2-011Order by part number
Shade fabricSize record—H1-002H1-002H2-002Remade to the record
Rope sectionAt the connectors——S1-031S2-031Order by part number
Surfacing tilesZone recordP1P1P1P1Spare tiles and repair kit
An open project file with installation drawings, a part list and pre-assembly photosOne per park

One project file per park

Each park has its own . The same package is sent to you with the shipping documents and kept on file with us.

  • Approved drawings
  • Installation drawings
  • Part list
  • Packing list
  • Footing drawings
  • QC readings
  • Pre-assembly photos
Depot shelves with parts bins sorted by part numberBy part number

Recommended spares list per park

Each park’s project package includes a recommended spares list, naming the parts to keep on the shelf for that park by part number. Your crew builds one stock from these lists, and shared parts are held once for every park.

Spare kit laid out: fasteners, post caps, plugs, touch-up paint and security bitsEvery shipment

The spare kit

Every shipment carries a spare kit, which goes straight into that stock.

  • Fasteners
  • Post caps
  • Plastic plugs
  • Touch-up paint in the structure’s color
  • Security bits
One project manager for your department

Your department has one project manager for every park, who keeps the department parts list and handles every parts request. Across all your department’s projects, the list shows every park’s parts by part number, which are shared across parks and which belong to one structure.

Project file: the approved drawings, installation drawings, part list, packing list, footing drawings, QC readings and pre-assembly photos of one park, kept with us and sent to you.
07/ 14 · Two parks, one message

Replacing a Part in Any ParkPhoto, Part Number, Same Mold, Same RAL Code

When your crew finds a damaged part in any of your parks, the replacement is made to the original part number.

How a request runs

The crew photographs the part and reads its part number from the part list or the label. The project manager checks it against that park’s project file and the department parts list, and our QC confirms the part. The replacement is made to the same number.

We reply within 24 hours on business days. Small parts go by air courier, and larger parts travel with your next shipment. Parts can be ordered outside a main order.

When a new park’s shipment is unpacked, anything missing or damaged is reported the same way, with photos and part numbers.

An example

A crew finds a cracked panel on structure S2 in one park and a worn bumper on a fitness station in another. Both go in one message with photos and the two part numbers.

The project manager confirms each against its park’s file, the panel is cut again from its CNC file in its RAL color, the bumper is made to its F number, and both ship by courier. The crew unbolts the old parts with the security bits already in stock.

An opened steel mold in the rotomolding workshop beside a freshly molded slideSame steel mold

Why the new part matches

Slides, tunnels and roofs are molded in our own steel molds, so a slide ordered years later comes from the same mold as the one it replaces. Custom panels are cut from the CNC file stored in the project file, and colors follow the recorded RAL code.

A fitness station bearing housing opened to change the bearing, with the post left in placeF number · bolted housing

Moving and wear parts

Fitness station bearings have their own part numbers. The bearing housing is bolted and opened to change the bearing, with the post and footing left in place, and rubber bumpers are replaced the same way.

Rope sections change at the connectors. Shade fabric is remade to the size record in the project file. Surfacing is repaired to the zone record, from spare tiles and the poured-in-place repair kit in the shipment.

A crew member checking the coating of a long-used park play structureSame terms · every park

Warranty by component

10years on steel structure
5years on rotomolded and HDPE parts
2years on rope, moving parts and soft play

For every park on the same terms.

Several parks · one department file
  • Layout per park
  • 2D plan
  • 3D renders
  • Itemized quotation
Anna, Sales Manager at Run Playgrounds

Send the site plans of the parks you are planning

Send them with the ages to serve and your budget range to Anna, our Sales Manager. Each park gets a 2D and 3D layout with an itemized quotation within 3 working days.

08/ 14 · Design stage and public review

Public Meeting and Council Approval Files3D Renders From the Plan Model and a Layout Within Your Budget

A municipal playground moves through design, public review, bid and award. At the design stage, the 2D plan, 3D renders and itemized quotation go to the department or its landscape architect, drawn on your DWG base and DWG-compatible.

Eye-level render of a proposed community park playground from the plan modelEye level · from the plan model
2D plan · DWG
The renders are made from the same model as the plan, with aerial and eye-level views, so what residents see is what gets built.
Layout 1
Aerial render of the same park layout
S1 S2 F1 H1 · swing bay
Layout 2 · within your budget range
Aerial render of the alternative layout within the budget range, same camera
S1 S2 H1

Departments use the renders for public meetings, community consultation and council or parks board approval. On request, an alternative layout within your budget range is drawn for comparison, so residents compare two options side by side.

Public meetingsCommunity consultationCouncil / parks board approval
A public meeting in a community hall with residents looking at a playground render on a screenPublic meeting

Your landscape architect receives the files a park specification is written from

  • Scaled PDF plans
  • DWG 2D plan
  • Plan and elevation per piece · use zones · deck heights
  • Surfacing area table by surfacing type
  • Compliance document list
  • Itemized quotation
09/ 14 · Who receives what at each stage

Open Bid and Award FilesThe Same Specification for Every Bidding Installer

Here is who receives what at each stage of a municipal playground equipment project, from design to closeout. Pick your role to see your files.

Five stages · five rolesReceives at: design · public review · award · closeoutReceives at: design · bidReceives at: bidReceives at: award
Files each role receives at the design, public review, bid, award and closeout stages of a park playground project
RoleDesignPublic reviewBidAwardCloseout
Department
2D plan3D rendersItemized quotation
Renders for the meetingLayout 1 | Layout 2
—
Pre-assembly photos and videoFactory visit by appointment
Project package → department fileParts → department parts list
Landscape architect
DWG 2D plan · scaled PDFsElevations · surfacing tableCompliance document list
—
Editable specification textData sheet for every item
——
Residents & council —
Aerial and eye-level rendersTwo layouts side by side
———
Bidding installers ——
Installer A
Spec
Drawings
Data sheets
Installer B
Spec
Drawings
Data sheets
Installer C
Spec
Drawings
Data sheets
Same set · same S-numbers
ABC
—
Winning installer ———
Footing detail drawingsInstallation drawingsQuotation for the approved layout
Registered to the winning bidder
—
Installers comparing the same printed specification and drawings in an officeBid · compared line by line

Bid stage

On request, we supply editable specification text for the tender and a data sheet for every item, as described on school playground equipment.

Every bidding installer receives the same specification, drawings and item data sheets, with the same structure numbers, so bids are compared line by line. Files are issued unbranded or in the installer’s brand.

The winning installer setting out footings on site from the footing detail drawingsAward · footing drawings

Award

After award, the project is registered to the winning bidder, and the winning installer receives the footing detail drawings, installation drawings and quotation for the approved layout. Production takes 20–30 days after drawing approval.

A park play structure fully pre-assembled in the factory yard before packingPre-assembled before packing

Production and closeout

You can visit the factory by appointment while your parts are in production, and you receive pre-assembly photos and video of your structures before packing.

The project package goes into your department file, and the park’s parts join the department parts list. Departments can also order directly; installer and dealer terms are on wholesale playground equipment.

10/ 14 · Year by year, one file

Adding Parks and Phases Over Budget YearsNew Parks on the Same Department File

Most departments build and renovate parks one budget year at a time. Each new phase and each new park hangs on the same department parts list.

This budget year

Park A · phase 1

Drawn on the component system, parts into the department list.
Next budget year

Park A · phase 2

Same project file, part numbers, molds and RAL colors.

Park B · new park

New structure numbers, same component system.
Grant-funded · inclusive items list with the tender
A later year

Park C · new park

Shared spares already on your shelf fit it.

+ Next park

Added to the department parts list.

A second phase in the same park is ordered to that park’s project file, with the same part numbers, molds and RAL colors.

A new park is drawn with its own structure numbers on the same component system, and its parts are added to the department parts list, so the shared spares already on your shelf fit it.

When a park is funded through a grant, the inclusive items list and labels on inclusive playground equipment go with the tender files. How a budget is met by adjusting scope is on playground equipment cost.

Phase 1 of a community park playground after installationPhase 1
The same park after phase 2 with a swing bay and shade added in the same colors, same cameraPhase 2 · same RAL
Playground entry sign in engraved HDPE with the age range, rules and a blank block, on a post at the park play area
11/ 14 · Signs at every entry

Park Playground Entry SignsAge Range, Rules and Your Department’s Contact

Each play area can have an entry sign with the age range and the playground rules, CNC-engraved in 19 mm HDPE in our panel and CNC workshop. A blank block on the sign carries your department’s contact.

Fitness zones have their own 13+ zone sign. Park names and department emblems can go on signage and panels, engraved or inlaid in two colors of HDPE. More custom layers are on custom playground solutions.

Fitness zone entry sign at the edge of an outdoor fitness area13+ zone sign
  • 19 mm HDPE
  • Panel & CNC workshop
  • Engraved or two-color inlay
12/ 14 · Files for your crew and your installer

Park Inspection and Installation FilesGuide, Checklist and Footing Drawings

Every park project package includes an inspection and maintenance guide for your crew, and an installer’s completion checklist for use before your playground inspector visits.

Site excavation, concrete footings, permits and installation are by your installer, from the footing detail drawings for every post, the step-by-step assembly drawings and videos cut from your own structure’s pre-assembly.

An on-site supervisor is optional. Installation steps are on playground equipment installation.

By your installer

  • Site excavation
  • Concrete footings
  • Permits
  • Installation

From us

  • Footing and assembly drawings
  • Assembly videos
  • Optional on-site supervisor
  • Inspection & maintenance guideFor your crew
  • Installer’s completion checklistBefore your inspector visits
  • Footing detail drawingsEvery post
  • Step-by-step assembly drawingsBy structure number
  • Assembly videosCut from your structure’s pre-assembly
A maintenance crew member checking fasteners against the inspection guideInspection guide · your crew

Installer’s completion checklist · sample

CheckDone
Footings poured to the footing detail drawing for every post
Every part fitted to its part number on the installation drawing
All tamper-resistant fasteners tightened and capped
Post caps and vent plugs in place
Surfacing laid to the zone record under every piece
Manufacturer, age-range and entry signs fitted
Spare kit handed to the department crew
InstallerDate
A playground inspector measuring a use zone with a tape beside a park structureUse zone · measured on site
13/ 14 · Your market, your tender

Standards for Municipal ParksASTM, EN, CSA and AS With the Compliance List

Park equipment is designed to ASTM F1487 and the CPSC Public Playground Safety Handbook, with surfacing to ASTM F1292, accessible surfacing to ASTM F1951 and fitness stations to . Or to the standard named in your tender.

Standards park playground equipment is designed to, by market
MarketEquipmentSurfacingAccessible surfacingOutdoor fitness
USASTM F1487 + CPSC HandbookASTM F1292ASTM F1951ASTM F3101
EN marketsEN 1176EN 1177—EN 16630
CanadaDrawn to CSA Z614
AustraliaDrawn to AS 4685
  • Every quotation lists the compliance documents.
  • Third-party testing arranged per project on request, with a lab you can name.

Details are on playground safety standards.

ASTM F3101: the US standard for unsupervised public outdoor fitness equipment for users 13 and over; EN markets use EN 16630.
A planner's desk with satellite printouts of several parks, site photos and a DWG plan on a laptopSeveral parks · one message
14/ 14 · Copy this list into your first message

What to Send for a Park Playground Layout

Copy this list into your first message.

Site

  • Site plan or DWG base for each park, or a satellite screenshot with photos
  • Park type: pocket, neighborhood, community or destination
  • Paths, parking, trees, lighting and anything that stays

People

  • Ages to serve: 6–23 months, 2–5, 5–12, and a 13+ fitness zone
  • Inclusive pieces and the accessible route needed

Spec

  • Shade, splash pad or fitness trail wanted
  • Vandal-resistant options: stainless slides, other options
  • Park colors, park name or department emblem for signs
  • Standard: ASTM F1487, EN 1176, CSA Z614, AS 4685 or the one in your tender

Process

  • Stage: design, public meeting, bid or award, and your landscape architect
  • Budget range, phases, and other parks planned for the department
Park type
Ages to serve

File attached? Anna will ask you to send it by email or WhatsApp after the form arrives.

Form not going through? Message Anna on WhatsApp +86 177 0272 7677

Send Your Site Plans WhatsApp